Barry Bucknell's weekly do-it-yourself TV guide to jobs in the home.
The concrete floor in the lower kitchen was laid some weeks ago-now it needs covering with lino tiles. There is a small washbasin to be fitted in the lower bathroom. And It is time to get on with the wallpapering: in the old house there are a dozen rooms and landings that need papering. giving a dozen opportunities over the next few weeks to show the various snags that crop up.